Giving

Morgan Hall Expansion

At Trinity Episcopal School, we believe in fostering a dynamic learning environment that prepares students to be engaged world citizens. As part of our strategic vision, we are renovating Morgan Hall in the Summer of 2025 to include a 3,600-square-foot expansion of the lower level extending beneath the current library. This expansion is a transformative step forward in ensuring that Trinity students are equipped to navigate an ever-evolving world with confidence and creativity.

Trinity’s Innovation Program is rooted in the philosophy that adaptability and problem-solving skills are paramount in an unpredictable future. The expansion and relocation of our Innovation and Robotics Labs will integrate technology, and science in a collaborative space. The state-of-the-art labs will provide hands-on experiences that inspire strategic thinking and innovative problem-solving. By fostering creativity, Trinity ensures that our students are prepared for the opportunities and challenges of tomorrow.

This expansion goes beyond enhancing the Innovation Program; it also optimizes our physical space to better support our entire community. With increased common areas, improved classroom configurations, and expanded student services, this project will create an environment that is both functional and inspiring. These updates will "right-size" our campus footprint, ensuring that every student has access to the resources they need to thrive.
The Morgan Hall expansion is more than just a structural addition; it is a commitment to Trinity’s future. It represents our dedication to innovation, student well-being, and academic excellence. 

We invite you to be a part of this transformative journey. Your investment in Trinity Episcopal School ensures that our students receive the best education possible, in a space designed for discovery, collaboration, and growth.

Together, we build the future of Trinity. Together, we’re READY FOR LAUNCH! 

For more information on how you can support this initiative, please contact Sam Mickens at sammickens@trinityes.org or (804) 327-3153.

Project Features

The Morgan Hall expansion and reconfiguration will introduce:
  • A Larger, Centralized Innovation Lab and Robotics Lab: Keeping these vital programs at the heart of student life near the courtyard, fostering engagement and exploration.
  • An Outdoor Patio for Hands-on Learning: A dedicated space for experiential education and collaboration in an open-air setting.
  • A Flexible-use Classroom: Offering adaptability to accommodate a range of academic and enrichment activities.
  • An Expanded Academic Resources Center: Featuring additional space and an office for faculty to support individualized learning.
  • Enhanced Photography and Titan Prep Spaces: Providing improved facilities for students to refine their artistic and preparatory skills.
  • A Better-equipped Nurse’s Office: Ensuring student health and wellness remain a top priority.
  • An Expanded Library on the Upper Level: Creating more common space to encourage reading, study, and collaboration.
  • New Sidewalks for a Safer Drop-off Lane: Enhancing safety and accessibility for students and families.
  • The TESPN Recording Studio: Repurposing the former Robotics Lab in the Estes Athletic Center to support our school’s growing broadcasting and media programs.

Contact Us

List of 2 members.

  • Photo of Sam Mickens

    Sam Mickens 

    Leadership Gifts Officer, Head Football Coach, DEI Advisory
    (804) 327-3153
  • Photo of Sarah Herbert

    Sarah Herbert 

    Assistant Director of Development & Alumni Relations
    804-672-4929